Providing Services Only Dhaka

Call Us  01827788788

Washing Machine Installation Service in Dhaka

Washing Machine Installation Service in Dhaka

Purchased a new washing machine or relocating to a new home? Proper installation is essential for ensuring smooth operation, optimal performance, and long-term reliability. Incorrect installation can lead to water leakage, excessive vibration, drainage problems, and reduced machine lifespan.


At Qanat Flow Engineering, we provide professional washing machine installation services for front-load, top-load, semi-automatic, and fully automatic washing machines. Our technicians ensure that your machine is correctly positioned, connected, and tested before use.

aboutImag03

What Is Included in Washing Machine Installation?

  • Washing Machine Positioning & Leveling
  • Water Inlet Connection
  • Drainage Hose Setup
  • Electrical Connection Check
  • Leak Testing
  • Operational Testing
  • Basic User Guidance
  • Safety Inspection
Repair Charge Starting From

BDT 1,000

The final installation cost may vary depending on machine type, installation location, plumbing requirements, additional accessories, and overall work scope.

What to Expect?

  • Professional Installation by Experienced Technicians
  • Proper Water & Drainage Connection
  • Machine Level Adjustment
  • Performance Testing Before Completion
  • Guidance on Basic Operation & Maintenance
Suitable For
  • New Washing Machine Installation
  • Reinstallation After Relocation
  • Home & Apartment Installation
  • Office & Commercial Laundry Setup
  • Front Load & Top Load Machines

Additional charges may apply for:

 

  • New Water Inlet Hose
  • Drain Pipe Extension
  • Water Tap Installation
  • Additional Plumbing Work
  • Electrical Socket Modifications
  • Machine Relocation Within the Premises

The technician will provide a quotation before performing any additional work.

Proper installation helps:

 

  • Prevent Water Leakage
  • Reduce Excessive Vibration
  • Improve Washing Performance
  • Protect Internal Components
  • Extend Machine Lifespan
  • Ensure Safe Operation
  • 7 Days Service Warranty on installation workmanship.
  • Manufacturer warranty remains applicable according to the machine brand’s warranty policy.

Qanat Flow Engineering is not responsible for existing plumbing issues, low water pressure, faulty electrical connections, structural limitations, or problems identified during installation but declined for correction by the customer.

Payment can be made after successful installation through Cash, Mobile Banking, Bank Transfer, or Online Payment.

 

Please collect and retain your payment receipt for future service support.

Book Professional Washing Machine Installation Today

Ensure your washing machine is installed correctly and ready for hassle-free operation.

Needs Any Help?

Completely synergize resource taxing via premier markets professionally.

Contact Title
Call Any Time 01827-788788